Changes between Version 18 and Version 19 of OSGeoIncubationChecklist


Ignore:
Timestamp:
Mar 26, 2014, 9:55:37 PM (11 years ago)
Author:
Peter Baumann
Comment:

Legend:

Unmodified
Added
Removed
Modified
  • OSGeoIncubationChecklist

    v18 v19  
    11[[PageOutline]]
    22
    3 This page lists the OSGeo graduation checklist status for rasdaman, comments and discussion are welcome on the rasdaman-users mailing list (rasdaman-users _@ googlegroups.com).
    4 
    5 = Principles of OSGeo Projects (The OSGeo Way) =
    6  * Projects should manage themselves, striving for consensus and encouraging participation from all contributors - from beginning users to advanced developers.
    7  * Contributors are the scarce resource and successful projects court and encourage them.
    8  * Projects are encouraged to adopt open standards and collaborate with other OSGeo projects.
    9  * Projects are responsible for reviewing and controlling their code bases to insure the integrity of the open source baselines.
    10 
    11 = Operating Principles =
    12  * Projects should document how they manage themselves.
    13  * Projects should maintain developer and user documentation.
    14  * Projects should maintain a source code management system.
    15  * Projects should maintain an issue tracking system.
    16  * Projects should maintain project mailing lists.
    17  * Projects should actively promote their participation in OSGeo.
    18  * Projects are encouraged to adopt OSGeo look and feel, branding, logos on their project sites.
    19  * Projects are encouraged to participate in OSGeo standardization efforts to present a common interface for OSGeo visitors and members.
    20  * Projects should have automated build and smoke test systems.
     3This page lists the OSGeo graduation checklist status for rasdaman as per [http://www.osgeo.org/incubator/process/project_graduation_checklist.html OSGeo graduation checklist]; comments and discussion are welcome on the rasdaman-users mailing list (rasdaman-users _@ googlegroups.com).
    214
    225
     
    8063
    8164  a. [[Image(http://upload.wikimedia.org/wikipedia/commons/c/cc/Icons-mini-icon_accept.gif)]] (duplicate of Open item 1.b) The project uses public communication channels for decision making to maintain transparency. E.g. archived email list(s), archived IRC channel(s), public issue tracker.
    82 
    8365
    8466